LT to Bobby Jones Banner

Stay involved by subscribing to the project's email distribution list - Click Here

The Legacy Trail to Bobby Jones

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Pre-Study

Project Description 

The Legacy Trail to Bobby Jones project was a trail extension project that would connect the Legacy Trail to Bobby Jones Golf Course and Sarasota County's 17th Street Park. The City of Sarasota worked with Kittelson and Associates to study the area of the proposed alignments to accurately determine the alignment. 

As part of the Pre-Study, two alignments were proposed for the connector from the current Legacy Trail alignment to the BJGC. The first alignment (shown in orange) is located along a old railroad property now owned by the City and County, providing a safe, alternative route for pedestrians, bicyclists, and micromobility opportunities to access essential services, parks, and other amenities. The second alignment (shown in blue) is along Beneva Road, a high-speed/volume arterial with a history of pedestrian/bicycle crashes. The Pre-Study focused on the alignments south of Fruitville Road first.

A final report and technical memorandum has been published below to provide information regarding the Pre-Study and the next steps for the project.

The conceptual locations of the proposed trail alignments can be seen on the image below.

 

Final Report and Next Steps Technical Memorandum

 

Project History

The City of Sarasota’s Transportation Master Plan, Sarasota in Motion (SiM) identified trails network expansion as the #1 priority. As part of this plan, the City has developed the Legacy Trail Network where Legacy Trail to Bobby Jones Golf Course (BJGC) was one of the primary connectors. The BJGC connector is part of the Gulf Coast Trail found in the Florida Department of Environmental Protection – Office of Greenways and Trails map. This trail would connect residents and tourists from Venice, FL to the City of Sarasota, Sarasota County, and eventually be part of Florida’s regional trail system. The City Commission has adopted a plan to turn a large portion of BJGC into a nature park and conservation area where the City has an opportunity to connect BJGC with Sarasota County’s 17th Street Park by using this trail system.

 

LT to Bobby Jones Timeline Updated

 

Stay involved by subscribing to the project's email distribution list - Click Here

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer

Legacy Trail to Bobby Jones Golf Course Trail Extension
Right-of-Way Surveying Notice

The City of Sarasota is working with Kittelson and Associates as well as George F. Young to review and survey a City of Sarasota and Sarasota County drainage easement abutting properties in the Eastwood Park neighborhood.

Project Limits:

Legacy Trail approx. 200ft east of Beneva Rd. Heading north through the City Property and County drainage easement to Fruitville Rd.

Schedule:

Aug. 16, 2023 to mid-November

Surveying Hours:

Monday-Friday from 7AM to 5PM

 

Legacy Trail to Bobby Jones Golf Course Trail Extension
Stakeholder Community Meetings

Project Limits:

Legacy Trail approx. 200ft east of Beneva Rd. Heading north through the City Property and County drainage easement to Fruitville Rd.

Meeting Location:

Veterans of Foreign Wars (VFW) Sunshine Post 3233
124 S Tuttle Avenue
Sarasota, FL 34237

Dates:

Tuesday, December 12, 2023 at 5:30pm
Wednesday, December 13, 2023 at 5:30pm
Thursday, December 14, 2023 at 5:30pm

Stakeholder Community Meetings Materials

Legacy Trail Stakeholder Community Meetings Property Owner Newsletter_2023_11_09_Page_1

  

Contact:

Alvimarie Corales, Chief Transportation Planner

City of Sarasota, Public Works Department

Alvimarie.Corales@sarasotafl.gov